5 of 7Temple, Sharm el Sheikh, Egypt
The first-stage of the regulator attached to the tank valve. This part takes 200 bar tank air and turns it into 7-10bar medium-pressure air. The medium pressure air is then delivered at ambient pressure through the mouthpiece by the second stage demand valve.
From: Diving | Album: Sharm el Sheikh 2007