9 of 13Paint it White
Day 3: Preparing the office. The wallpaper had to be cut and covered with spackling paste, which is drying here.
Album: Vattugatan 15
9 of 13Paint it White
Day 3: Preparing the office. The wallpaper had to be cut and covered with spackling paste, which is drying here.
Album: Vattugatan 15